Industrial

Monsanto

2023-09-12T00:36:10+00:00

Monsanto contracted with Hayden Wrecking to demolish dryers that were supporting conveyors at their facility in Boone. IA. The schedule required the completion of the project prior to the beginning of the grain harvest in August. The dryers were located adjacent to equipment and structures which were to remain in place. Hayden Wrecking trained demolition craftsmen utilized manlifts and cutting torches to selectively dismantle structural components on the dryer in order to separate it from the structures to remain. The crew also removed the conveyors from the dryers so that they could be reinstalled. An Ultra High Demolition Excavator equipped with […]

Monsanto2023-09-12T00:36:10+00:00

Midwest Service Group / Mississippi Lime

2023-08-05T18:16:48+00:00

Mississippi Lime Company contracted with Midwest Service Group to abate asbestos and remove the existing baghouses, preheaters and associated structures at their facility. Midwest Service Group subcontracted the dismantling of the baghouses, preheaters and associated structures to Hayden Wrecking. The iters that were be to removed were situated around equipment and structures that were to remain in place. Hayden Wrecking utilized an Ultra High Demolition Excavator equipped with a rotating shear to dismantle the baghouses. A standard configured demolition excavator equipped with a rotating shear was used to further process materials and load out. The rotating shear was then replaced with […]

Midwest Service Group / Mississippi Lime2023-08-05T18:16:48+00:00

Helmkamp Construction / Tinuum Services, LLC/ Kentucky Utilities

2023-08-05T18:20:29+00:00

Helmkamp Construction Company was contracted by Tinuum Services, LLC to remove existing limestone equipment, install new equipment and perform structure modifications, etc. Helmkamp Construction subcontracted the removal of the existing limestone equipment to Hayden Wrecking. Hayden Wrecking lead exposure trained demolition craftsmen utilized a manlift, cutting torches and a hydraulic crane to dismantle the elevated limestone conveyors and support structure. Our craftsmen then utilized burning bars to cut up a stainless steel coal hopper. The salvageable material generated from the conveyors, structure and hopper were taken to a recycling firm.

Helmkamp Construction / Tinuum Services, LLC/ Kentucky Utilities2023-08-05T18:20:29+00:00

Westlake Chemical

2023-09-12T00:36:20+00:00

Westlake Chemical contracted with Hayden Wrecking to demolish the existing 45’ x 60′ × 50’ tall 2 cell cooling tower during a department shutdown. The cooling tower was adjacent to a control room and equipment that was to remain in place. The basin for the cooling tower was to remain in place and to be left undamaged. The project schedule allowed 12 hours to complete demolition and clean up so a new cooling tower could be erected in the same foot print. Hayden Wrecking utilized an Ultra High Demolition Excavator equipped with a rotating sorting grapple to demolish the cooling tower […]

Westlake Chemical2023-09-12T00:36:20+00:00

Rentech Nitrogen, LLE

2023-08-05T18:20:50+00:00

Rentech Nitrogen contracted with Hayden Wrecking to dismantle the existing 140′ tall Prill Tower within their operating facility. The Prill Tower was aluminum construction and was surrounded by operating facilities and structures that were to remain in place. Hayden Wrecking utilized a lattice boom crane and its trained demolition craftsmen to dismantle the Prill Tower in sections. The sections were further dismantled utilizing a standard size demolition excavator equipped with a rotating shear then loaded into recycling containers.

Rentech Nitrogen, LLE2023-08-05T18:20:50+00:00

Weyerhaeuser

2023-09-12T00:38:35+00:00

Weyerhaeuser contracted with Hayden Wrecking to dismantle a Salt Cake Tower and Calciner at its facility in Oglethorpe, GA. Both structures were in close proximity to existing operations. Hayden Wrecking demolition craftsmen trained in lead exposure utilized manlifts, cutting torches, and a hydraulic crane to dismantle the Salt Cake Tower. An Ultra High Demolition Excavator equipped with a rotating shear was used to dismantle the upper portions of the Salt Cake Tower to grade. Due to the Calciner’s material thickness, our craftsmen further utilized manlifts and cutting torches as well as the Ultra High Demolition Excavator and rotating shear to dismantle, […]

Weyerhaeuser2023-09-12T00:38:35+00:00

Springfield Coal

2023-08-05T18:21:00+00:00

Springfield Coal contracted with Hayden Wrecking to dismantle the existing breaker building, conveyors and their associated structures located at the Crown Ill Mine. The breaker building contained numerous types of process equipment. Hayden Wrecking utilized an Ultra High demolition excavator equipped with a rotating shear to dismantle the taller portions of the structures. A standard configured demolition excavator equipped with a rotating shear was utilized to further dismantle the components and load out the materials. Hayden Wrecking Demolition Craftsmen equipped with cutting torches down-sized the materials that were too heavy to cutwith mechanical methods. The salvageable materials generated from the precipitators […]

Springfield Coal2023-08-05T18:21:00+00:00

Buzzi Unicem USA

2023-08-05T18:21:10+00:00

Buzzi Unicem USA is a manufacturer of cement products that contracted with Hayden Wrecking to dismantle existing precipitators and their associated structures that were no longer being utilized. These precipitators and structures were located between rotary kilns and a stack that were to remain in place. A portion of the precipitators contained asbestos so Hayden Wrecking subcontracted the removals to an asbestos abatement firm. Hayden Wrecking utilized an Ultra High demolition excavator equipped with a rotating shear and a standard configured demolition excavator equipped with a rotating shear to dismantle the shorter portions of the precipitators and structures. The taller portions […]

Buzzi Unicem USA2023-08-05T18:21:10+00:00

Manus Pacific/Tennessee Valley Authority

2023-09-12T00:44:39+00:00

Tennessee Valley Authority contracted with Magnus Pacific to dismantle existing facilities in Muscle Shoals, AL. Magnus Pacific subcontracted with Hayden Wrecking to provide a 90’ Ultra High Demolition Excavator equipped with rotating work tools and a Demolition Operator to demolish and dismantle the existing structures. The first structures to be demolished were the vertical concrete silos. Hayden Wrecking utilized a 90′ Ultra High Demolition Excavator equipped with a rotating concrete pulverizer. The other structures were dismantled utilizing the 90′ Ultra High Demolition Excavator equipped with a rotating shear. All of the material was processed and loaded by Magnus Pacific personnel for […]

Manus Pacific/Tennessee Valley Authority2023-09-12T00:44:39+00:00

Atlas Industrial Contractors/General Motors

2023-09-12T00:34:43+00:00

Atlas Industrial Contractors was contracted by General Motors to remove the existing equipment and structures in the Body Shop and install new equipment during a plant shut down. Atlas Industrial Contractors subcontracted the removal of the existing equipment and structures to Hayden Wrecking. The project schedule required the work to be performed working 12 hour shifts around the clock until it was completed so the plant could resume operations. The facility conditions required precautions be taken to protect equipment, structures, etc. that were to remain in place. Hayden Wrecking utilized small equipment and manpower to dismantle the equipment and structures.Hayden Wrecking […]

Atlas Industrial Contractors/General Motors2023-09-12T00:34:43+00:00