Projects

Manus Pacific/Tennessee Valley Authority

2023-09-12T00:44:39+00:00

Tennessee Valley Authority contracted with Magnus Pacific to dismantle existing facilities in Muscle Shoals, AL. Magnus Pacific subcontracted with Hayden Wrecking to provide a 90’ Ultra High Demolition Excavator equipped with rotating work tools and a Demolition Operator to demolish and dismantle the existing structures. The first structures to be demolished were the vertical concrete silos. Hayden Wrecking utilized a 90′ Ultra High Demolition Excavator equipped with a rotating concrete pulverizer. The other structures were dismantled utilizing the 90′ Ultra High Demolition Excavator equipped with a rotating shear. All of the material was processed and loaded by Magnus Pacific personnel for […]

Manus Pacific/Tennessee Valley Authority2023-09-12T00:44:39+00:00

Woodward & Curran/Siemens

2023-09-12T00:48:37+00:00

Woodard and Curran was contracted by Siemens to remediate contaminated soil, replace with suitable materials, construct a new concrete tank containment, relocate existing tanks to the new tank containment, install piping, electrical, and demolish the existing concrete containment. Woodard & Curran subcontracted all of the work to Hayden Wrecking. Hayden Wrecking utilized a standard configured excavator and 40-hour Hazwoper trained personnel to perform the contaminated soil remediation. We also managed the construction of the new concrete tank containment, relocated the existing tanks, installed piping and electrical utilizing local approved subcontractors. After the existing tanks were relocated, a standard configured demolition excavator […]

Woodward & Curran/Siemens2023-09-12T00:48:37+00:00

Atlas Industrial Contractors/General Motors

2023-09-12T00:34:43+00:00

Atlas Industrial Contractors was contracted by General Motors to remove the existing equipment and structures in the Body Shop and install new equipment during a plant shut down. Atlas Industrial Contractors subcontracted the removal of the existing equipment and structures to Hayden Wrecking. The project schedule required the work to be performed working 12 hour shifts around the clock until it was completed so the plant could resume operations. The facility conditions required precautions be taken to protect equipment, structures, etc. that were to remain in place. Hayden Wrecking utilized small equipment and manpower to dismantle the equipment and structures.Hayden Wrecking […]

Atlas Industrial Contractors/General Motors2023-09-12T00:34:43+00:00

SPX Cooing Technologies/PCS Nitrogen

2023-08-05T18:21:27+00:00

SP Cooling Technologies was contracted by PCS Nitrogen to replace their existing 6 cell cooling tower at their facility in Lima, OH. SPX Cooling Technologies subcontracted with Hayden Wrecking to perform the demolition of the existing cooling tower during a plant shutdown. The project schedule allowed 5 days for demolition and cleanup. New piping was installed along the length of the existing cooling tower prior to demolition which limited access to one end to perform demolition and cleanup. Hayden Wrecking utilized an Ultra High Demolition Excavator equipment with a rotating sorting grapple to demolish the cooling tower. A standard configured excavator […]

SPX Cooing Technologies/PCS Nitrogen2023-08-05T18:21:27+00:00