Project Portfolio

of

Client: Magnus Pacific/Tennessee Valley Authority
Location: Muscle Shoals, AL
Project: Silo and Structure Dismantling
Year: 2015  Duration: 3 months
Project Description:
Tennessee Valley Authority contracted with Magnus Pacific to dismantle existing facilities in Muscle Shoals, AL.  Magnus Pacific subcontracted with Hayden Wrecking to provide a 90’ Ultra High Demolition Excavator equipped with rotating work tools and a Demolition Operator to demolish and dismantle the existing structures.  The first structures to be demolished were the vertical concrete silos.  Hayden Wrecking utilized a 90’ Ultra High Demolition Excavator equipped with a rotating concrete pulverizer.  The other structures were dismantled utilizing the 90’ Ultra High Demolition Excavator equipped with a rotating shear.  All of the material was processed and loaded by Magnus Pacific personnel for disposal off-site.

Corporate Office
4201 St. Clair Avenue
Washington Park, IL 62203
(618)874-8318

Louisiana Office
804 Main Street
Baton Rouge, LA
(225)308-4522

Texas Office
405 Main Street
Houston, TX
(281)656-6559

Corporate Office
4201 St. Clair Avenue
Washington Park, IL 62203
(618)874-8318

Louisiana Office
804 Main Street
Baton Rouge, LA
(225)308-4522

Texas Office
405 Main Street
Houston, TX
(281)656-6559