Admin

About Admin

This author has not yet filled in any details.
So far Admin has created 42 blog entries.

Atlas Industrial Contractors/General Motors

2023-09-12T00:34:43+00:00

Atlas Industrial Contractors was contracted by General Motors to remove the existing equipment and structures in the Body Shop and install new equipment during a plant shut down. Atlas Industrial Contractors subcontracted the removal of the existing equipment and structures to Hayden Wrecking. The project schedule required the work to be performed working 12 hour shifts around the clock until it was completed so the plant could resume operations. The facility conditions required precautions be taken to protect equipment, structures, etc. that were to remain in place. Hayden Wrecking utilized small equipment and manpower to dismantle the equipment and structures.Hayden Wrecking […]

Atlas Industrial Contractors/General Motors2023-09-12T00:34:43+00:00

SPX Cooing Technologies/PCS Nitrogen

2023-08-05T18:21:27+00:00

SP Cooling Technologies was contracted by PCS Nitrogen to replace their existing 6 cell cooling tower at their facility in Lima, OH. SPX Cooling Technologies subcontracted with Hayden Wrecking to perform the demolition of the existing cooling tower during a plant shutdown. The project schedule allowed 5 days for demolition and cleanup. New piping was installed along the length of the existing cooling tower prior to demolition which limited access to one end to perform demolition and cleanup. Hayden Wrecking utilized an Ultra High Demolition Excavator equipment with a rotating sorting grapple to demolish the cooling tower. A standard configured excavator […]

SPX Cooing Technologies/PCS Nitrogen2023-08-05T18:21:27+00:00
Go to Top