Client: Woodard and Curran/Confidential Client
Location: Kansas City, MO
Project: Soil Remediation and Above Ground Storage Tank Relocation
Year: 2015  Duration: 3 months
Project Description:
Woodard and Curran was contracted by Siemens to remediate contaminated soil, replace with suitable materials, construct a new concrete tank containment, relocate existing tanks to the new tank containment, install piping, electrical and demolish the existing concrete containment.  Woodward and Curran subcontracted all of the work to Hayden Wrecking Corporation.  Hayden Wrecking utilized a standard configured excavator and Hayden Wrecking personnel that were 40 hour Hazwopper trained to perform the contaminated soil remediation.  Hayden Wrecking managed the construction of the new concrete tank containment, relocating the existing tanks, installing piping and electrical utilizing local approved subcontractors.  After the existing tanks were relocated Hayden Wrecking utilized a standard configured demolition excavator equipped with a hydraulic breaker operated by Hayden Wrecking 40 hour Hazwopper trained personnel to remove the existing concrete tank containment.  The hydraulic breaker was replaced with a bucket to load out the materials.  The site was then backfilled and graded.